12 November 2018
It floats and has done for a while
![]() |
| The boat left our house in 2016, off to a local (cheap) boatyard. Then we sold the house and moved out at the end of March 2017. |
![]() |
| We launched the day before Easter 2017, when Cyclone Cook was supposedly battering us silly. Although it was a bit damp, we missed the storm and had a smooth launching. |
| We moved on board early May 2017, sorted the new dodger/hard top out and got many jobs ticked off. You can see the bow fittings in this shot, taken just before we dropped the rig in. |
| Once the mast was in place we were able to get the table finished. A single piece of Kauri! |
![]() |
| We've even got a name! |
25 April 2016
Is that the time?
Movement has started again in Weta land. For the last few years we have been busy with school and football, so we decided not to bother launching the boat as we had no time to use it. Now that stage of our lives is coming to an end - our son has left school and we are beginning to see a path to the water.
Recent progress has been to get the Coppercoat applied to the bottom. My friend Cedric came up to supervise, as he has done it before. Another good mate, Mal, got dragged in to help as well, which was a good call. It is a full-on day and we got cracking as soon as the dew dried off, finishing after dark.
I have taken the opportunity to fit the propellor as well, so I can get the shoe fitted and epoxied over before winter brings rain and damp.
The quadrant and autopilot ram are also in place, more pictures soon.
Recent progress has been to get the Coppercoat applied to the bottom. My friend Cedric came up to supervise, as he has done it before. Another good mate, Mal, got dragged in to help as well, which was a good call. It is a full-on day and we got cracking as soon as the dew dried off, finishing after dark.
![]() |
| Ready to start |
![]() |
| First coat on the forward end, second coat under way |
![]() |
| About to finish about the 4th coat? |
![]() |
| Nearly done! |
![]() |
| It is a 20" Autostream feathering propellor |
07 April 2012
Still here
In the cockpit, I have installed the remote anchor windlass control, a manual bilge pump and the diesel system breather.
The galley has cleaned up nicely, just a bit of varnish work to finish off on the teak at deck level.
The steering pedestal is now in place, you can see the foam and glass plinth that the pedestal stands on, replacing the old lump of teak. The grab rail is through-bolted from below and is nice and sturdy, as well as leakproof.